Office to Library

The short term need for an office in the basement was no longer there, and I'd been wanting to get the large bookshelf out of the master bedroom, so I reconfigured the basement office as a library.  I'll need to get a floor lamp for it later.

Right now it's setup with some Ikea Expedit shelves that I've had for a long time, primarily due to their versatility.  I'll replace them later with something nicer, but no rush there.

Also got the DIY sound traps up in the Den.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.