Skip to main content

Office to Library

The short term need for an office in the basement was no longer there, and I'd been wanting to get the large bookshelf out of the master bedroom, so I reconfigured the basement office as a library.  I'll need to get a floor lamp for it later.

Right now it's setup with some Ikea Expedit shelves that I've had for a long time, primarily due to their versatility.  I'll replace them later with something nicer, but no rush there.

Also got the DIY sound traps up in the Den.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.