Finally got around to doing the window trim on the inside for the bathroom and office. Not painted yet, but much better than the rough frame I've been looking at for a few months.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.
Comments
Post a Comment