Reading Nook

Getting lots of things done that aren't visible, but did do one.  Got the reading nook started.  First step was to do the back wall.  Unfortunately this used all of the wood I had, so I'll have to get more for the footwell on the other side.
And then put some of the trim in place
I finally put the futon in, for now just to get it out of the way.  I'll have to remove the cover and wash as it's a mess right now, but this gives you an idea for what the nook will look like when it's done.


Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.