New Lighting

The track lighting in the new master bedroom worked so well that I've decided I'm going to add track lighting to the old master bedroom and the living room.  Both of which were very dark.  Phase 1, cut out the drywall to allow wiring access.
Step 2, install preliminary connections, and a few test lights.  Also going to update the roof color from grey to light blue in the old master bedroom, so here you can see I'm filling in all of the holes.

There will be a lot more track to add.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.