Bedroom Trim

Got the door and baseboard trim installed in the bedrooms. 

Unfortunately a small leak in the roof appeared in the new master bedroom, so I'm waiting for the roof guy to fix that before I can order the carpet for the bedrooms. 

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.