Got the door and baseboard trim installed in the bedrooms.
Unfortunately a small leak in the roof appeared in the new master bedroom, so I'm waiting for the roof guy to fix that before I can order the carpet for the bedrooms.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.
Comments
Post a Comment