Got the door and baseboard trim installed in the bedrooms.
Unfortunately a small leak in the roof appeared in the new master bedroom, so I'm waiting for the roof guy to fix that before I can order the carpet for the bedrooms.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
First coat of paint on in the basement listening room. Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this:
Comments
Post a Comment