Skip to main content

Office Setup

Drywall is still temporary, but while I was working from the home office I decided to add a 2nd 40" display.
A 4k 27" main monitor, 40" 1080p secondary monitor, and a 4k 40" TV not connected to the computer (yet, until I decide to get a better graphics card) that I can use for watching TV while working.

And a cat who fights me for chair ownership....

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.