Got the basement bedroom all cleared out and ready to start mudding. Need to have it done at the same time as the listening room so that I can get the carpet installed.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Comments
Post a Comment