Basement Progress September 09, 2018 Not far now. Will need to extend the track lighting so that each light is directly above the pots. Bed frame will arrive next week, then need to install the blinds and paint the doors. Should have the smoke detector soon too. After that, all done. Share Get link Facebook X Pinterest Email Other Apps Share Get link Facebook X Pinterest Email Other Apps Comments
Comments
Post a Comment