Not far now. Will need to extend the track lighting so that each light is directly above the pots. Bed frame will arrive next week, then need to install the blinds and paint the doors. Should have the smoke detector soon too. After that, all done.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
First coat of paint on in the basement listening room. Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: