Not far now. Will need to extend the track lighting so that each light is directly above the pots. Bed frame will arrive next week, then need to install the blinds and paint the doors. Should have the smoke detector soon too. After that, all done.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.