Back Yard Work Started

 Have all the rock for the retaining wall delivered.


Getting the new edging installed.  It will be 2 rows of 4x4 treated timbers.  That will elevate the area next to the house, which will be filed with river rock, up lights, and some planters.





Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.