Have all the rock for the retaining wall delivered.
Getting the new edging installed. It will be 2 rows of 4x4 treated timbers. That will elevate the area next to the house, which will be filed with river rock, up lights, and some planters.
Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it. This will look good once the flooring is installed.
First coat of paint on in the basement listening room. Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: