Skip to main content

Posts

Long Overdue

Doesn't look like much, but this has been on the todo list for a while.  Finally got the oven vent and plumbing vent removed and a proper roof patch in place.  Now I can put some patch beams in the exposed hole and smooth it over so that it can be painted.

Ceiling and Office

Got the ceiling painted in the theater room , and 2 test fascia beams put in. The beams didn't turn out as well as I'd like, I'll experiment with some other options.  The trim hasn't been installed on the ceiling yet, that is next. I also got the new wall units, and desks installed in the office.  I decided to move the library upstairs and the office downstairs.

Drywall and Ceiling Started

Finished the texture and paint in the theater, also started on the ceiling. And with all of the wood in place These are 1/2" birch plywood, with the edges routered.  This gives them the look of engineered panels rather than just plywood.  Part of the goal was that I wanted something removable, something I could paint a dark color (for more perceived headroom) and something that could accommodate the non-consistent height of the rafters.  Doesn't look like much in rough form, but next I'll paint it the same dark green as the ducting, and then put some wood runners to give it an artificial rough look. The theater is the proof of concept and test bed for these ideas.  If they turn out well, the rest of the basement will get this treatment.

Landscaping Started

Started some landscaping cleanup and ended up starting the retaining wall template. It will look a little ghetto for a while, as I'm using scrap wood to determine where the rock wall will be.  In front of it will be a sloped parking pad.  Probably just crushed rock, but I might get it asphalted. Allowing the parking pad to slope will help with drainage, as most of the water from the driveway, and a lot of rain water flows through that area. Initially I thought I'd be digging a lot, but it turns out that I'll be adding a lot of topsoil to backfill.  The wall face will be made with 1-man and 1/2-man basalt rock, similar to this style.

New Oven

Found a good deal on a new oven for the house.  I've put it in place as a temporary fitting. The actual plug is preventing it from resting properly, and it seems clear I'll need to move those cabinets about 1/2" away from the wall to allow for proper clearance.  It doesn't rub now, but the final cabinet faces might be wider, and I want a little room for error.

Big Mess

In the middle of a lot of projects, so the house is a big mess right now Got all of the upstairs electrical done, including doing the 220v for the oven. And got it all inspected, so now I can finally start putting the cabinets in.  They are in a cheap white for now, not sure if I'll stick with white or not. The oven is also just the old one stuffed into place, and not the correct 30" size.  Need to start thinking seriously about cabinet face type so I can pick a matching oven.

Mailbox

Finally updated my mailbox to a locking style.  Guess which one? Not bad for $25, some paint and a new handle. (though the post was another $55...and $15 for the cement).