My brother-in-law went to town on the stump in the back yard. Now at least it isn't obstructing the view anymore. It will take a while not only to split the removed part, but later I'll rent a stump grinder so that the entire center piece there can be removed about 6" below grade. I'll then temporarily concrete over it so that the patio is more usable. Eventually the whole patio will need to be redone though.
I'm still using a lot of old Ikea Expedit stuff for storage. It works, and is flexible, but not fancy. Been on the lookout for something better. Ran across this on CL for only $300, and got them to deliver. Right now it's just staged in the open area of the basement. I should be able to finish the framing and drywall in the old theater, and I'll move these in there.
Comments
Post a Comment