First coat of paint on in the basement listening room. Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this:
Getting started on the float and tape job on the upstairs half bath. Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down. Looks ugly, but it's actually not bad. Won't know for sure how it will look till the last coat. Plan is to do a texture-free level 5 finish. Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.
Comments
Post a Comment