Skip to main content

Door

Got the new door installed and all of the primary framing done.

There's a little bit of clean-up framing to do, and I need to get the closet door ordered ASAP.  I'll start on the subfloor and electrical next.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Accent Wall

Been meaning to add some color to the main living area for a while.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.