Master Bedroom Layout

This shows the old layout and new layout.  The images show with a queen size mattress in the room.  This shows how it barely fit in the old layout.
The demolition is taking longer than expected.  They really overbuilt the framing.  Each door has a 4x8 header over it, and it seems as if the construction team was paid by the nail.

Here is the pile of all the non-reusable wood I pulled out.


Right now I have all the framing out, and most of the drywall, but will need to remove some more drywall before I'm done with demo.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.