Skip to main content

Kitchen Windows

Finally getting the kitchen windows fully installed.  Since I'm using a dark color on the trim, I had to compensate for that by using a black window caulk, and my pre-painting before installing any of the white trim.  Here I'm getting ready to install the raw glass
And here I've installed them and put some paint on before installing the inner trim
The last piece on the right ended up being too large, so I'll have to re-order a piece for that.  

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.