Main Windows Part 2 August 09, 2020 2 Windows installed, can only transport 2 at a time so I'll have to go back for the 3rd on Monday. Think I'll have the rest delivered. Share Get link Facebook X Pinterest Email Other Apps Share Get link Facebook X Pinterest Email Other Apps Comments
Bathroom Waterproofing February 16, 2022 Waterproofing the shower. 1 primer coat, 5 coats on the walls, 7 on the pan. Tested and approved by the inspector. Next is upper pan and then tile. Read more
Accent Paint August 25, 2013 Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color. Read more
Back Wall Done October 13, 2020 Finally 100% done with the back wall of the house. Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later. Read more