Carnage

Tearing up the breakfast area, and pulling all of the wires out of the breaker box so that I can put some new floor joists in.

Removed the drywall from the wall at the end of the stairs
 Had to cut a hole in the floor to get access to the West side of the floor joist
 Flooring removed
 Had to remove the basement window so I could slide the floor joist in.
 Here is all the wiring, pulled from the breaker box through all of the joists I need to alter, then restrung temporarily until I get all the new joists and supports in.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.