Carnage

Tearing up the breakfast area, and pulling all of the wires out of the breaker box so that I can put some new floor joists in.

Removed the drywall from the wall at the end of the stairs
 Had to cut a hole in the floor to get access to the West side of the floor joist
 Flooring removed
 Had to remove the basement window so I could slide the floor joist in.
 Here is all the wiring, pulled from the breaker box through all of the joists I need to alter, then restrung temporarily until I get all the new joists and supports in.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.