Skip to main content

More Demo

Doesn't look like much, but a couple of hours of work and now I have this:
They had built up about 8 2x10's as a cross support all nailed together.  Getting that out took a while.  I've also removed the framing and remaining drywall from the back wall.  Later this week I'll work on getting the stairway framing done.  If all goes well I hope to finish that sometime next weekend.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: