Skip to main content

More Demo

Doesn't look like much, but a couple of hours of work and now I have this:
They had built up about 8 2x10's as a cross support all nailed together.  Getting that out took a while.  I've also removed the framing and remaining drywall from the back wall.  Later this week I'll work on getting the stairway framing done.  If all goes well I hope to finish that sometime next weekend.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.