More Framing

Finally don't have to duck when going down into the basement for the first time in a couple of months:
Doesn't look like much, but got the 2 remaining joists installed, and the support framing installed so that I could cut the final old joists.  Going to take a while to get the span framed properly, hopefully I'll have that done this weekend.

Also installed the first set of 4 recessed can lights, which is officially the first new wiring installed in the house.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.