More Framing

Finally don't have to duck when going down into the basement for the first time in a couple of months:
Doesn't look like much, but got the 2 remaining joists installed, and the support framing installed so that I could cut the final old joists.  Going to take a while to get the span framed properly, hopefully I'll have that done this weekend.

Also installed the first set of 4 recessed can lights, which is officially the first new wiring installed in the house.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.