More Framing

Finally don't have to duck when going down into the basement for the first time in a couple of months:
Doesn't look like much, but got the 2 remaining joists installed, and the support framing installed so that I could cut the final old joists.  Going to take a while to get the span framed properly, hopefully I'll have that done this weekend.

Also installed the first set of 4 recessed can lights, which is officially the first new wiring installed in the house.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: