Landscaping Update

Cleaned up the side of the entryway.  I popped the cap off that pipe that was sticking up and confirmed the smell of diesel, so it was a vent pipe for the oil tank, so I cut it off.  I then pulled the dirt away from the foundation a little and painted the concrete a shade just a bit darker than the main siding.  I then filled it with river rock.  Here is the result.  Finally I have a decent looking entryway.  That vent pipe was really, really ugly.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.