Landscaping Update

Cleaned up the side of the entryway.  I popped the cap off that pipe that was sticking up and confirmed the smell of diesel, so it was a vent pipe for the oil tank, so I cut it off.  I then pulled the dirt away from the foundation a little and painted the concrete a shade just a bit darker than the main siding.  I then filled it with river rock.  Here is the result.  Finally I have a decent looking entryway.  That vent pipe was really, really ugly.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.