Skip to main content

Mess

Getting the plumbing water lines done, so pretty much everything is a mess right now.  Getting the exact fitting you need can be a real pain in the ass sometimes.  So I get to leave it like this for a couple of days while I try to find the correct fitting for the icemaker, the correct size hammer arrestors, and more fun stuff.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.