For now, minus a few minor items I'll take care of later.  Very long weekend, but now the office, den, theater, and landing room are all wired for power and CAT6, drywalled, and all have scrap flooring that makes them 100% usable.

Here is the theater, which I finished today

As with the other rooms, I won't bother to float and tape these until I finish the kitchen an laundry upstairs.  I'll figure out how to hang the sound traps on the wall as well.  Man, I'm beat.  Might take a few weeks off.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.