Skip to main content

Basement Done

For now, minus a few minor items I'll take care of later.  Very long weekend, but now the office, den, theater, and landing room are all wired for power and CAT6, drywalled, and all have scrap flooring that makes them 100% usable.

Here is the theater, which I finished today

As with the other rooms, I won't bother to float and tape these until I finish the kitchen an laundry upstairs.  I'll figure out how to hang the sound traps on the wall as well.  Man, I'm beat.  Might take a few weeks off.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.

Back Wall Done

 Finally 100% done with the back wall of the house.  Windows installed, trim done, and paint. The windows will probably get pretty messy until I have time to install the edging and river rock along the edge, but that will come later.

Ready for drywall

Got all the code approvals, ready to put up drywall