Skip to main content

Basement Done

For now, minus a few minor items I'll take care of later.  Very long weekend, but now the office, den, theater, and landing room are all wired for power and CAT6, drywalled, and all have scrap flooring that makes them 100% usable.

Here is the theater, which I finished today

As with the other rooms, I won't bother to float and tape these until I finish the kitchen an laundry upstairs.  I'll figure out how to hang the sound traps on the wall as well.  Man, I'm beat.  Might take a few weeks off.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.