Kitchen subfloor is in. Just a few edge pieces to do.
Now that the flooring is in I can finally do the plumbing connections. Still need to do the subfloor in the half bath, that will come later this weekend. Planning to build a temporary bench for use as a kitchen so that I can get use of my sink back.
I'm still using a lot of old Ikea Expedit stuff for storage. It works, and is flexible, but not fancy. Been on the lookout for something better. Ran across this on CL for only $300, and got them to deliver. Right now it's just staged in the open area of the basement. I should be able to finish the framing and drywall in the old theater, and I'll move these in there.