Skip to main content

Subfloor

Kitchen subfloor is in.  Just a few edge pieces to do.
Now that the flooring is in I can finally do the plumbing connections.  Still need to do the subfloor in the half bath, that will come later this weekend.  Planning to build a temporary bench for use as a kitchen so that I can get use of my sink back.

Comments

Popular posts from this blog

Accent Paint

Here the paint is about 1/2 done, so with one coat it's a little splotchy on the wall, but gives a good feel for the color.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Listening Room Paint

First coat of paint on in the basement listening room.  Shows the potential, but it will definitely need a 2nd coat: Electronics room too: Next comes trim and covering the ceiling. A pretty big improvement considering it looked like this when I moved in: And until recently it looked like this: