Subfloor

Kitchen subfloor is in.  Just a few edge pieces to do.
Now that the flooring is in I can finally do the plumbing connections.  Still need to do the subfloor in the half bath, that will come later this weekend.  Planning to build a temporary bench for use as a kitchen so that I can get use of my sink back.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.