Kitchen subfloor is in. Just a few edge pieces to do.
Now that the flooring is in I can finally do the plumbing connections. Still need to do the subfloor in the half bath, that will come later this weekend. Planning to build a temporary bench for use as a kitchen so that I can get use of my sink back.
We're set to close on the 15th of October, so I'm getting a little braver with my fixes and updates. I realize I want a little experience with the new airless sprayers before I tackle painting the exterior of the house. I also know that once I pull down the ceiling tiles in the basement, I'll want something to make it look decent while I'm working on the wiring and rearranging the upstairs. I thought I'd do a dark paint on the exposed wood. I'd seen pictures of that done in basements before and liked the look. The basements in this house are about 8" tall, a little lower than that when duct work or plumbing is a factor, so while not low, it can't hurt to have a dark look to improve the height of the ceiling. So, I figured I'd start by painting the ceiling in the unfinished part of the basement. Here are some before pictures: The paint I used was the same dark flat Olive Green I'd used on the lighting plate in the bathroom. It...
Comments
Post a Comment