Drywall

After several months of looking at nothing but studs, I finally have a fully enclosed Laundry room.
Finished up some plumbing and wiring and had the inspectors out on Friday to approve it and allow me to start covering up the walls.  In the process I also solved the wiring issue with the kitchen lights, as I have a track light extending straight from the laundry wall to a full-length track lighting system for the kitchen.  I need to do some finish work on the wiring from track to track, but that's a formality at this point.  This means I won't have any ugly connection box or box cover on the track system, so it will look nice and tidy.

Also, got the lighting for the 1/2 bath done.  Obviously needs some finish work, but much better than the wall-wart lighting it had before.  I might consider doing something like this in the bedrooms at some later date too.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.