Skip to main content

Drywall

After several months of looking at nothing but studs, I finally have a fully enclosed Laundry room.
Finished up some plumbing and wiring and had the inspectors out on Friday to approve it and allow me to start covering up the walls.  In the process I also solved the wiring issue with the kitchen lights, as I have a track light extending straight from the laundry wall to a full-length track lighting system for the kitchen.  I need to do some finish work on the wiring from track to track, but that's a formality at this point.  This means I won't have any ugly connection box or box cover on the track system, so it will look nice and tidy.

Also, got the lighting for the 1/2 bath done.  Obviously needs some finish work, but much better than the wall-wart lighting it had before.  I might consider doing something like this in the bedrooms at some later date too.

Comments

Popular posts from this blog

Basement Painting

We're set to close on the 15th of October, so I'm getting a little braver with my fixes and updates.  I realize I want a little experience with the new airless sprayers before I tackle painting the exterior of the house.  I also know that once I pull down the ceiling tiles in the basement, I'll want something to make it look decent while I'm working on the wiring and rearranging the upstairs.  I thought I'd do a dark paint on the exposed wood.  I'd seen pictures of that done in basements before and liked the look.  The basements in this house are about 8" tall, a little lower than that when duct work or plumbing is a factor, so while not low, it can't hurt to have a dark look to improve the height of the ceiling. So, I figured I'd start by painting the ceiling in the unfinished part of the basement.  Here are some before pictures:  The paint I used was the same dark flat Olive Green I'd used on the lighting plate in the bathroom.  It...

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.