Skip to main content

Basement Office

Did lots of framing this weekend, and started putting up drywall in the last office in the basement.
Should be able to finish it in the next few days.  That one bottom piece on the far wall isn't particularly straight, but after floating and taping, you won't be able to tell.

Comments

Popular posts from this blog

Ugly Float and Tape

Getting started on the float and tape job on the upstairs half bath.  Pretty ugly so far. This is just the first coat, which is really intended to just get the tape down.  Looks ugly, but it's actually not bad.  Won't know for sure how it will look till the last coat.  Plan is to do a texture-free level 5 finish.  Not sure if I'll be able to pull it off or not, worst case if it doesn't pan out I can just throw some texture up.
Figuring out a plan for the sunken area, cleared it all out.  Will likely need to deal with the chimney first.

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.