More Windows and Venting

Got the vent pipe fully installed now
 I have a sheet of foam insulation behind the tube.  I'll put regular insulation on top of it before putting the drywall on.

Also, since the other window didn't fit right, I decided to rip out the trim on the guest bedroom so I could confirm the windows are all the same size.
I'll leave the window in the master bedroom as is for now, order 2 more windows and install those in the guest bedroom and office.  If they fit right then I'll get a replacement for the master bedroom and the bathroom.

Comments

Popular posts from this blog

Bathroom Waterproofing

Waterproofing the shower.  1 primer coat, 5 coats on the walls, 7 on the pan.  Tested and approved by the inspector.  Next is upper pan and then tile.

Harry Potter Hole

Harry Potter Hole, as my friends started calling it, has had its internal trim installed, and I've put paint on the shelving below it.  This will look good once the flooring is installed.

Laundry and Bathroom

 Got the backsplash done in the laundry room, next I need to finish the plinth and that room is done. And have the primer coat. And first sealing coat of waterproofing done one the basement bathroom It will probably need 2-3 more coats before it's ready for inspection.