More Windows and Venting

Got the vent pipe fully installed now
 I have a sheet of foam insulation behind the tube.  I'll put regular insulation on top of it before putting the drywall on.

Also, since the other window didn't fit right, I decided to rip out the trim on the guest bedroom so I could confirm the windows are all the same size.
I'll leave the window in the master bedroom as is for now, order 2 more windows and install those in the guest bedroom and office.  If they fit right then I'll get a replacement for the master bedroom and the bathroom.

Comments

Popular posts from this blog

Craigslist Find

I'm still using a lot of old Ikea Expedit stuff for storage.  It works, and is flexible, but not fancy.  Been on the lookout for something better.  Ran across this on CL for only $300, and got them to deliver. Right now it's just staged in the open area of the basement.  I should be able to finish the framing and drywall in the old theater, and I'll move these in there.

Basement Bathroom Progress

 Just for reference, here is the original, claustrophobic, non-code-compliant basement bathroom. And here is progress on the much larger bathroom, even though to overall footprint is the same size. The shower has been expanded to fill the entire width, and the ceiling raised in the shower area.  The original was a generic shower stall, and was very dark and cramped.  This will be much brighter and while the dimensions are small, won't feel nearly as cramped.

Kitchen Progress

 Backsplash tile almost done, just need to install the outlets and faceplates.